Inspections

Find scaffold inspection records, understand the company checklist and check the permissions needed to create or approve them.

CloudScaff records scaffold inspections using your company’s Inspection Certificate Template. The template supplies the categories and questions; the completed record belongs to the selected scaffold.

Before recording an inspection

  • Open Sites, select the site, then open the required scaffold.

  • Check the scaffold code, description and location in Overview.

  • Confirm that the company inspection template contains the required questions. Template changes are managed in Settings → Templates → Inspection Template.

Complete the company checklist

Use the Inspection action available for the scaffold and record the actual findings against the configured questions. Read each question literally; Yes and No must not be treated as universal Pass and Fail labels. Follow the inspection procedure agreed for the site when recording exceptions; do not assume that an unanswered question represents a completed check.

Permissions and records

Scaffolds → Inspections has separate Create, View and Approve permissions. If the action is unavailable, ask your administrator to check your role and site access. Inspection certificates can be reviewed through the scaffold records and Scaffold Log.

Desktop walkthrough: review an inspection form without submitting

This verified desktop walkthrough clarifies the reference above. Read each checklist question literally: Yes is not a universal Pass response. It does not verify signing, submission, approval, certificates, or resulting status and log changes.

Open a scaffold’s inspection list and review the Add Inspection form on desktop without creating a record.

CloudScaff records scaffold inspections using your company’s Inspection Certificate Template. The template supplies the categories and questions; the completed record belongs to the selected scaffold.

Before you begin

Use an existing site and scaffold. If the scaffold does not exist yet, follow How to Create a Scaffold first. Check the scaffold code, description and location in Overview before opening its inspection form.

This walkthrough was checked on 5 November 2026 using SAMPLE SITE 01 and scaffold SCA26000001 (tag DEMO-NY-01). It covers opening, reviewing and closing an unchanged form without submitting it. The scaffold was Pending, and Add Inspection opened before a handover existed. Do not treat a handover as a mandatory prerequisite for opening this form.

Desktop: open the inspection form

1. Click Sites in the main navigation.

2. Click the required site code.

3. Click the site’s Scaffolds tab.

4. Click Pending if its scaffold list is hidden. Skip this click if the list is already expanded.

5. Click the required scaffold code.

6. Click the Inspections tab.

Desktop scaffold inspection list with a red circle and arrow marking the Inspections tab; the example list shows No data to display and 0 total.

The list shows Code, Notes, Date, Created By, Uploads and Status. In this example it showed No data to display and 0 total. An empty list is not a completed inspection.

7. Click the yellow plus (+) button at the bottom right.

Desktop inspection list corner with a red circle and arrow marking the yellow plus button used to open Add Inspection.

The Add Inspection form opens. The header identifies the scaffold, scaffold type, tag, site and date issued. A certificate code shown in this unsaved form is not evidence that an inspection record has been created.

Desktop: review the form without making changes

Leave fields and controls unchanged during this read-only walkthrough. The five form sections are Scaffold details, Safety checklist, Inspection outcome, Attachments and Signature.

8. Scroll down to Scaffold details.

Review the displayed Tag No, Description, Location, Length, Width, Height and Level. The example’s geometry and Deck Details were prefilled from the existing scaffold. Section Safe for use displayed Yes before any checklist answers or overall outcome were entered. Review defaults against the actual scaffold; a default is not evidence that the scaffold is safe. Do not change this control as part of this walkthrough.

Untouched Scaffold Details section with a red circle and arrow marking Section Safe for use displaying Yes; this default is not evidence of scaffold safety.

9. Scroll down to Safety checklist.

The observed company template supplied 31 questions with Yes and No choices. Your company’s template may differ. Read each question literally and record actual findings only when carrying out an authorized inspection under the site’s procedure. Do not assume that Yes always means Pass: the example includes “Is there any evidence of settlement, subsidence, or instability?” and “Are there overhead obstructions, powerlines, or hazards nearby?” An unanswered question is not a completed check. Leave all answers untouched for this walkthrough.

10. Scroll down to Inspection outcome.

The overall question is “Is the scaffold safe for use?” Both choices were unanswered in the untouched form. Notes is labelled optional. The overall outcome is separate from the Section Safe for use default above.

11. Scroll down to Attachments.

This section displays a document, photo or video upload area and Choose file. No upload was tested. Do not select a file during this walkthrough.

12. Scroll down to Signature.

The form displays a Name field, a blank signature area, Clear and Save. The example Name was prefilled as Byron Wood. A prefilled name is not a signature or permission to sign on that person’s behalf. Do not draw, clear or save a signature during this walkthrough.

Create Inspection was disabled in the untouched form. This observation does not establish all validation requirements or prove what will happen after signing or submitting.

Desktop: leave the form unchanged

13. Click the back arrow beside Add Inspection.

Add Inspection header before exiting, with a red circle and arrow marking the back arrow beside Add Inspection; this image does not show the returned inspection list.

The screenshot marks the exit control before leaving the form; the returned empty list was checked separately.

The Inspections list returns. After the unchanged form was closed, the example still showed No data to display and 0 total. The form was not submitted.

Permissions and template reference

Scaffolds → Inspections has separate Create, View and Approve permissions. If the action is unavailable, ask your administrator to check your role and site access. Company checklist questions are managed in Settings → Templates → Inspection Template.

Not yet verified

This guide does not verify entering inspection findings, required-field validation, uploads, signing, Save, Create Inspection, approval, generated certificates, or resulting scaffold status and log changes. These require a separately authorized inspection workflow and must not be inferred from opening a blank form.

Mobile navigation has not been verified. These instructions and screenshots describe the desktop interface only.