# How to Create a Scaffold

## Purpose

Provide a controlled, permission-based way to create scaffold records, capture dimensions and hire details, and organize scaffolds within a site.

***

## How to Access

**Sites** → **Select Site** → **Scaffolds Tab** → **Create Scaffold** (+)

***

## Overview

In the **Site** you have selected, click on the tab **SCAFFOLDS**

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FQ3X3mDaDPgS8pB3OKg1i%2FScreenshot%202026-01-20%20at%2009.41.59.png?alt=media&#x26;token=8ade2552-2781-4999-ab39-e939e23816f7" alt=""><figcaption></figcaption></figure></div>

This will display the scaffold lifecycle accordions

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FxBpxjilZEaMALl79gFXh%2FScreenshot%202026-01-20%20at%2009.43.34.png?alt=media&#x26;token=233823f1-dc4a-4b8f-a31f-17c8cf49682f" alt=""><figcaption></figcaption></figure></div>

In the bottom right of your screen, click the (+) plus button to create a scaffold

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2Ff5E9V3Sk8M3MBqAHmvkj%2FScreenshot%202026-01-20%20at%2009.45.02.png?alt=media&#x26;token=77ecce95-9816-4d12-a577-30ed84d44718" alt="" width="73"><figcaption></figcaption></figure></div>

This will bring up the form to build a scaffold

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FMc0oxddkfVJeFsDIo8ey%2FScreenshot%202026-01-20%20at%2009.46.10.png?alt=media&#x26;token=8aaa27a3-fd43-4453-95b2-cf39ce7a9430" alt=""><figcaption></figcaption></figure></div>

> **Scaffold Details:** Contains key information about the scaffold, including start and end dates, dimensions, and scaffold type.
>
> **Board Details:** Contains information about the scaffold’s working levels.
>
> Both **Scaffold Details** and **Board Details** terminology can be customised in **Business Settings**.\
> **Scaffold Details** can be renamed to *Framework Details* or *Structure Details*\
> **Board Details** can be renamed to *Decks*, *Platforms*, or *Working Levels*\
> \
> *This allows the system to align with your company’s preferred terminology.*

Fill in all required fields and select **CREATE** in the bottom-right corner to create the scaffold.

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FD7jtm4nghq9GsQ4dggQ3%2FScreenshot%202026-01-20%20at%2009.48.36.png?alt=media&#x26;token=b2bf27f5-ea49-4000-a009-c819283acf76" alt="" width="150"><figcaption></figcaption></figure></div>

This creates a scaffold record, which will appear in the **Pending Scaffolds** lifecycle accordion

***

## Step-by-Step Workflow

Once the Add Scaffold form is open

## Scaffold Details

### Enter the **Erection Date** *(Required)*

* Click **Erection Date**
* Select the erection date from the date picker
* This field **must be completed** to continue

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2F2JBba7cJ4kncpVbvO42J%2FScreenshot%202026-01-20%20at%2011.05.23.png?alt=media&#x26;token=7afa24c3-ebb5-4b6d-9f61-994e2392b8e5" alt="" width="161"><figcaption></figcaption></figure></div>

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FVFQSMSjXZemLg7USNYRz%2FScreenshot%202026-01-20%20at%2011.08.20.png?alt=media&#x26;token=b7848b46-b3c4-431f-8ebf-c05ae70f12f2" alt="" width="188"><figcaption></figcaption></figure></div>

### Enter the **Dismantle Date** *(Required)*

* Click **Dismantle Date**
* Select the planned dismantle date
* This field **must be completed** to continue

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FHeYdsQDsKHjzuEfXZ9w4%2FScreenshot%202026-01-20%20at%2011.09.37.png?alt=media&#x26;token=7ec8c4b0-d8dd-4916-a900-73b26e9480a9" alt="" width="178"><figcaption></figcaption></figure></div>

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FHxkW0F7Vc99ByLMtMeAB%2FScreenshot%202026-01-20%20at%2011.10.05.png?alt=media&#x26;token=6adc2ab7-fa4a-4271-adac-3d708b7b9d24" alt="" width="188"><figcaption></figcaption></figure></div>

### **Use Hire** (Optional)

The **Use Hire** toggle is used if you wish to track the hire of a scaffold during a fixed period.

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FTtRogWHYpsYg76rWLi5u%2FScreenshot%202026-01-20%20at%2011.21.31.png?alt=media&#x26;token=e8a91a9f-e1c5-47d6-9300-70037d8e6bbf" alt="" width="113"><figcaption></figcaption></figure></div>

* **Hire Start Date**\
  Use this if the hire period starts on a different date from the scaffold erection date.
* **Hire Rate**\
  This can be entered as either:
  * a **daily hire rate**, or
  * a **once-off (lump sum) hire amount**
* **Hire Overrun Rate (Daily Rate)**\
  This is a **daily charge** applied when the scaffold remains active beyond the planned dismantle date.

All hire values are **automatically calculated and managed within reports**, where you can view totals, overruns, and hire costs if required.

{% hint style="danger" %}
Using **Use Hire** is completely optional.\
If you do not wish to track hire costs, simply leave the toggle **deactivated (OFF)** and no hire calculations will apply.
{% endhint %}

### Add a **Description** (Optional)

Enter a short, clear description of the scaffold or a unique identifier\
\&#xNAN;*(example: “Main building" or "Internal scaffold code”)*

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2Fvw6N7St7QK7M15ukzrqo%2FScreenshot%202026-01-20%20at%2011.31.22.png?alt=media&#x26;token=99705cd5-8f6a-4b03-a3a8-f6bee08c1ce1" alt="" width="375"><figcaption></figcaption></figure></div>

### Add **Location** (Optional)

Enter the scaffold’s physical location on site\
\&#xNAN;*(example: “North elevation”)*

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FV1QtMDrUS6ym6U0MaJpY%2FScreenshot%202026-01-20%20at%2011.32.39.png?alt=media&#x26;token=22416442-d961-4bb8-a897-b2b2445bdab5" alt="" width="375"><figcaption></figcaption></figure></div>

### Select the **Scaffold Type**

Open the **Scaffold Type** dropdown

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FcuvCGze9DEbtdw7nw9Uo%2FScreenshot%202026-01-20%20at%2011.27.41.png?alt=media&#x26;token=e66d46c5-24df-4f31-adb1-c38c0b24980d" alt="" width="188"><figcaption></figcaption></figure></div>

Choose the appropriate scaffold type

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2F7Vl7yAkX2LvikZmMClXZ%2FScreenshot%202026-01-20%20at%2011.31.44.png?alt=media&#x26;token=04ac75a3-78c9-480b-ba8c-894353c23bc8" alt="" width="127"><figcaption></figcaption></figure></div>

{% hint style="info" %}
[**Scaffold Types** can be updated in business settings, templates, and under scaffold types](https://docs.cloudscaff.com/settings/templates/scaffold-types-template-create-and-edit)
{% endhint %}

### Enter Scaffold Dimensions *(Required)*

Enter all scaffold measurements.

The system supports **metres (m)** and **feet (ft)** and will automatically handle the conversion based on your account settings.

* **Length (m / ft)**
* **Width (m / ft)**
* **Height (m / ft)**

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2F29C627pjnuYL3kRHS06a%2FScreenshot%202026-01-20%20at%2011.34.20.png?alt=media&#x26;token=691f87b0-6129-4c83-9e68-e24a52a7843d" alt="" width="375"><figcaption></figcaption></figure></div>

### Attachments (Optional)

**Attachments** allow you to add additional scaffold structures that are connected to an existing scaffold.

Attachments are typically used for elements such as:

* Cantilevers
* Buttresses

*Any secondary scaffold structure linked to the main scaffold*

When you click the green **+** button in the **Attachments** section

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FVOxkJTXaw4GCQ8KZX9ma%2FScreenshot%202026-01-20%20at%2011.36.38.png?alt=media&#x26;token=294b364d-9caa-4574-83d1-54c4d4bc3ca1" alt="" width="88"><figcaption></figcaption></figure></div>

The system creates a new attachment entry linked to the original scaffold.

Each attachment:

* Is treated as its **own scaffold structure**
* Uses the **same input fields** as a standard scaffold
* Is **tracked independently** for dimensions, weight, type, and reporting
* The **Level** field on an attachment represents the **height of the attachment above ground level or from the base of the structure**.
* Remains **visually and logically linked** to the main scaffold

This allows you to accurately represent complex scaffold builds while keeping all related structures grouped under a single scaffold record.

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FFVfh1hlSpnks0a1IlgT2%2FScreenshot%202026-01-20%20at%2011.42.25.png?alt=media&#x26;token=51000920-b906-4a19-aad6-a77544d97ff2" alt=""><figcaption></figcaption></figure></div>

> **Note:** \
> Attachments are optional. If your scaffold does not require additional connected structures, you can simply leave this section empty.

## Boards Details

The **Boards Details** section is used to record the boards, platforms, decks, or working levels installed on the scaffold.

Each entry represents a **level of boards** installed at a specific **height above the ground or from the base structure**.

### **Board item fields**

**Description (Optional)**\
A short note to describe the board type or usage (for example, timber boards, steel boards, or platform boards).

**Length (m / ft)**

**Width (m / ft)**

**Level (m / ft)**\
The height of the boards above ground level or from the base of the structure.\
**Qty**\
The number of boards installed at this level.

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2FlxOQU3GsmDJbwkEwbZW9%2FScreenshot%202026-01-20%20at%2011.49.27.png?alt=media&#x26;token=3742cfcd-64e4-4ea7-9905-5a4645317045" alt=""><figcaption></figcaption></figure></div>

#### **Adding and managing boards**

* Click the green **+** button to add another board item.
* Each item is tracked separately for reporting and measurement purposes.
* Use **Delete** to remove a board item if it was added in error.

> **Note:** \
> Boards are optional but recommended if you want accurate tracking, reporting, and visibility of scaffold platforms.

## Create Scaffold

Once you have entered all scaffold information, click the **CREATE** button in the bottom-right corner to create the scaffold.

<div align="left" data-with-frame="true"><figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2ForDxtmNYI0X4uKDl7wST%2FScreenshot%202026-01-20%20at%2009.48.36.png?alt=media&#x26;token=d83003b0-3165-46e7-bedc-ec808af4cbd2" alt="" width="150"><figcaption></figcaption></figure></div>

***

## What Happens Next

* A new scaffold is saved with an auto-generated code and the current site context.
* The scaffold appears in the Pending Scaffolds list because its initial status is pending-Work In Progress.
* Site and company scaffold totals are incremented.
* All scaffold logs and registers are updated to include the newly added scaffold

<figure><img src="https://3532476255-files.gitbook.io/~/files/v0/b/gitbook-x-prod.appspot.com/o/spaces%2FsVJ0qURLvzCOxTGXEZIZ%2Fuploads%2Fp9CVWEGoU6E24SE9Cbkq%2FScreenshot%202026-01-20%20at%2011.55.30.png?alt=media&#x26;token=8e894d0e-c0ef-4646-871a-e30303e94941" alt=""><figcaption></figcaption></figure>

{% hint style="info" %}
[Learn more about the scaffold log](https://docs.cloudscaff.com/logs/scaffold-log)
{% endhint %}

{% hint style="info" %}
[Learn more about the scaffold register](https://docs.cloudscaff.com/site-management/scaffold-register)
{% endhint %}

***

## Permissions Required

Permissions related to accessing **job sites, site data, creating and managing scaffolds on sites**.

| Section          | Permission | What this allows the user to do  |
| ---------------- | ---------- | -------------------------------- |
| Sites: Sites     | **View**   | View site details and site lists |
| Sites: Scaffolds | **Create** | Create new scaffolds on a site   |

***

## Troubleshooting and Common Questions

| Issue                                | Likely cause                                   | Resolution                                                                       |
| ------------------------------------ | ---------------------------------------------- | -------------------------------------------------------------------------------- |
| Scaffolds tab is missing             | Insufficient permissions                       | Request access to the scaffolds view permission for your role.                   |
| Add button does not appear           | Site is closed or create permission is missing | Verify site status and your scaffold create access.                              |
| Create/Update does not save          | Required fields are missing                    | Complete required dimensions and retry.                                          |
| Scaffold is not in the expected list | Status does not match the list’s filter        | Check the scaffold’s status value; it appears only in the matching status group. |
| Hire fields are not visible          | Use Hire is off                                | Toggle Use Hire to show hire fields.                                             |

***

## Common Mistakes to Avoid

* Setting a Dismantle Date earlier than the Erection Date.
* Turning off Use Hire after entering rates and expecting them to persist.
* Assuming the Add button will show on closed sites.
* Expecting voided scaffolds to remain visible in the Scaffolds tab.

***

## Related Pages and Links

* [Scaffold Details (open by selecting a scaffold in the list)](https://docs.cloudscaff.com/site-management/scaffolds)
* [Scaffold Register (tab within the Site view)](https://docs.cloudscaff.com/site-management/scaffold-register)
* [Site Instructions (if your workflow links instructions to scaffolds)](https://docs.cloudscaff.com/site-management/site-instructions)<br>